The Lombard Square project is a pioneering residential development integrating innovative architecture with green living principles. By navigating the complexities of rebar installation and prefabrication,this project dealt with complicated transfer beams, transfer slabs, RC columns, and core walls, which required detailed design, precise execution,coordination between the construction and lifting team and other trades, and stringent safety measures.Following the program,the Dashi Group worked together to achieve high-quality outcomes.Tot weeks working: 79 weeks, delivered on time as planned in the contract.